Production of building regulations information

A full set of construction drawings will be produced on the computer in AutoCAD format and submitted to building control.

At this stage, a structural engineer is usually appointed, and we may need to draw on the experience of other consultants, such as a SAP consultant if there is a large amount of glazed area proposed. I can suggest suitable appointments of specialists that I regularly work with, or alternatively I can work with those that you wish to appoint.

All the necessary documentation will be completed on your behalf to accompany the application and I will liaise with building control as necessary to achieve a full plans or conditional approval prior to start on site. Once an approval has been granted you will have sufficient information to give to a builder to commence the construction works.

I am registered with the LABC Partner Authority Scheme, which means I can work with various Local Authorities through a single point of contact and have access to pre-application discussions. Alternatively, I can work with an Approved Inspector.